Siddhirganj-Maniknagar 230 kV Transmission Line | |
---|---|
Objective(s) | •To evacuate power to be generated from the 335 MW under construction Power Plant and other incoming Power Plants at Siddhirganj. •To meet the growing demand of South-east part of Dhaka city and to relieve the existing 132 kV lines of this area through the new 230 kV double circuit transmission line. •To minimize transmission loss. |
Scope of Work | 1) Siddhirganj 230/132 kV, 2×225 MVA AIS Substation. 2) 230/132 kV, 2X300 MVA GIS substation at Maniknagar including one 132 kV bay extension in the existing 132/33 kV outdoor substation. 3) Siddhirganj – Maniknagar 230 kV Double Circuit O/H Transmission Line and relocation of an existing 132 kV dead-end Tower of Haripur line 1 & 2 by installing a new 132 kV dead-end Tower and provide underground cable connections. |
Project Cost | 300.51(crore BDT) |
Financed by/Donor | IDA (World Bank) |
Present Status | Physical: 100% Financial: 248.759 (crore BDT) |
Estimated Duration | August, 2009 to June, 2015 |
Project office | Project Director: Pranab Kumar Roy, Chief Engineer Address: 80, Mohakhali C/A (1st Floor), Dhaka-1212 Mobile: +88-01730016012 Telephone: 9859626, 9861492 Fax: N/A E-mail: manmis.pgcb@gmail.com |